Name | namewithspaces |
Abbreviation | Abbr |
Learning Cost | 333 |
Playing Cost | 666 |
Suggested Phases | 1,2,3 |
Mechanical Engineer | Industrial Design | System Engineer | Electrical Engineer | Production Engineer | Software Engineer |
---|---|---|---|---|---|
✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
BusinessNeeds | Stakeholder | Stakeholder Needs | System Requirements | System Structure Architecture |
---|---|---|---|---|
✔ | ✔ | ✔ | ✔ | ✔ |
System Functional Architecture | Detail Hardware Design | Detail Service Design | Detail Software Design | Manufacturing Operations |
---|---|---|---|---|
✔ | ✔ | ✔ | ✔ | ✔ |
Identify Stakeholders | Elicit Needs | Remove Ambiguity | Layman's Terms | Technical Terms | Teamworkings |
---|---|---|---|---|---|
3 | 1 | 8 | 5 | 10 | 9 |
Traceability | Priotizing | Exploring Breadth | Inside the Box | Outside the box | V&V |
11 | 7 | 2 | 4 | 6 | 12 |